Group home
Ursa - Alice Bissett
Downtown Commercial Core, Calgary, Alberta. Operated by Universal Rehabilitation Service Agency.
- Visits since 2023
- 2
- 0 of 2 visits
- Non-compliant visits since 2023
- 0
- 0% of visits
- Open non-compliances
- 0
- issued, in progress or ongoing
- Last assessed visit
- May 2026
- Compliant
Visits from January 1, 2023 to July 6, 2026, the comparison window. Only visits that assessed compliance are counted; consultations are not. Open means issued, in progress or ongoing when the file was taken; the other counts cover every year.
About this home
Every visit on record
Newest first. A visit that found nothing says so. Each finding shows the standard it was cited under, when it was issued, the date by which it had to be fixed, and where it stands.
May 21, 2026 · Inspection
Compliant
June 12, 2024 · Inspection
Compliant
June 29, 2022 · Inspection
Non-compliant
Act and Regulation Requirements — REG- Current fire inspection report
Evidence required of the most recent fire inspection report.
Issued August 14, 2017. Fix by March 31, 2024. Status: Rectified (June 29, 2022).
April 1, 2020 · Consultation
Not assessed (consultation)
Act and Regulation Requirements — REG- Current fire inspection report
Evidence required of the most recent fire inspection report.
Issued August 14, 2017. Fix by September 30, 2022. Status: Rectified (June 29, 2022).
August 8, 2019 · Inspection
Compliant
August 8, 2019 · Inspection
Non-compliant
Water Temperature — Safe water temperatures
Evidence required that the hottest water temperature flowing out of the faucets in resident areas do
Issued August 8, 2019. Fix by September 30, 2019. Status: Rectified (September 11, 2019).
Act and Regulation Requirements — REG- Current fire inspection report
Evidence required of the most recent fire inspection report.
Issued August 14, 2017. Fix by September 30, 2020. Status: Rectified (June 29, 2022).
August 1, 2018 · Inspection
Compliant
August 1, 2018 · Inspection
Non-compliant
Act and Regulation Requirements — REG- Current fire inspection report
Evidence required of the most recent fire inspection report.
Issued August 14, 2017. Fix by August 31, 2019. Status: Rectified (June 29, 2022).
August 14, 2017 · Inspection
Non-compliant
Act and Regulation Requirements — REG- Current fire inspection report
Evidence required of the most recent fire inspection report.
Issued August 14, 2017. Fix by August 31, 2018. Status: Rectified (June 29, 2022).
August 3, 2016 · Inspection
Compliant
August 11, 2015 · Inspection
Compliant
August 14, 2014 · Inspection
Compliant
August 21, 2013 · Inspection
Compliant
Questions to ask on a visit
Built from the standards this home was cited under, not from anything we found. Ask how it meets each one today.
- How does the home meet: Act and Regulation Requirements — REG- Current fire inspection report?
- How does the home meet: Water Temperature — Safe water temperatures?
Homes nearby
Straight-line distance between postal code centres (in rural Alberta, town centres). Each home’s share of non-compliant visits since 2023, on the same method as the city pages.
| Home | Type | Distance | Non-compliant |
|---|---|---|---|
| The Mustard SeedBeltline, Calgary · 224 units | Assisted living | under 1 km | 33%1 of 3 visits |
| The Mustard SeedBeltline, Calgary · 30 units | Assisted living | under 1 km | 67%2 of 3 visits |
| Clover LivingChinatown, Calgary · 174 units | Assisted living | under 1 km | 33%1 of 3 visits |
| Eau Claire Retirement ResidenceDowntown Commercial Core, Calgary · 73 units | Type B (designated supportive living) | 1.4 km | 75%3 of 4 visits |
| Aspira BritanniaCliff Bungalow, Calgary · 70 units | Assisted living | 1.5 km | 67%2 of 3 visits |
| Bow Valley CommonsBridgeland/riverside, Calgary · 61 units | Lodge | 1.5 km | 50%1 of 2 visits |
Check the government’s record
Inspections are a snapshot. Visit, ask for the home’s latest inspection report, and ask the questions above. Concerns about a specific visit go to the home first, then to the Continuing Care Licensing Office (cclo@gov.ab.ca).
Source: Government of Alberta, Continuing Care Accommodation Standards compliance reporting on Open Alberta (Open Government Licence – Alberta), file of —, with visits to July 6, 2026. Results are as the government recorded them. An inspection is a snapshot. The official record and the finding text are on the government’s viewer; the dates and statuses here come from the file. How this is built.