Assisted living
The Mustard Seed
Beltline, Calgary, Alberta. Operated by The Mustard Seed Society.
- Visits since 2023
- 3
- 2 of 3 visits
- Non-compliant visits since 2023
- 2
- 67% of visits
- Open non-compliances
- 0
- issued, in progress or ongoing
- Last assessed visit
- Oct 2025
- Non-compliant
Visits from January 1, 2023 to July 6, 2026, the comparison window. Only visits that assessed compliance are counted; consultations are not. Open means issued, in progress or ongoing when the file was taken; the other counts cover every year.
About this home
Every visit on record
Newest first. A visit that found nothing says so. Each finding shows the standard it was cited under, when it was issued, the date by which it had to be fixed, and where it stands.
October 29, 2025 · Inspection
Non-compliant
Social or Leisure Activities — Resident needs, feedback and opinions considered
Evidence required that residents' opinions have been considered in the planning of social or leisure
Issued October 29, 2025. Fix by January 29, 2026. Status: Rectified (October 29, 2025).
Water Temperature — Safe water temperatures
Evidence required that the hottest water temperature flowing out of the faucets in resident areas do
Issued October 29, 2025. Fix by November 20, 2025. Status: Rectified (October 29, 2025).
Maintenance Requirements — Preventative and corrective maintenance
Evidence required of a scheduled preventative maintenance and repair program.
Issued October 29, 2025. Fix by January 29, 2026. Status: Rectified (October 29, 2025).
Cleaning Requirements — Regularly scheduled cleaning of all areas
Evidence required that the accommodation is cleaned on a regularly scheduled basis.
Issued October 29, 2025. Fix by January 29, 2026. Status: Rectified (October 29, 2025).
Continuation of Services — Practicability, communication and review of plans
Evidence required that the continuation of services plan is communicated and made available to resid
Issued October 29, 2025. Fix by January 29, 2026. Status: Rectified (October 29, 2025).
Concerns and Complaints — Written processes for managing concerns and complaints
Evidence required of communication of the written process to residents, their representatives, visit
Issued October 29, 2025. Fix by January 29, 2026. Status: Rectified (October 29, 2025).
Continuation of Services — Contingency plans
Evidence required that the continuation of services plan includes provisions for loss of utilities,
Issued October 29, 2025. Fix by January 29, 2026. Status: Rectified (October 29, 2025).
Water Temperature — Training, maintenance and risk mitigation to ensure safe water temperatures
Evidence required that regularly scheduled checks are in place to ensure that safe water temperature
Issued October 29, 2025. Fix by November 20, 2025. Status: Rectified (October 29, 2025).
May 31, 2023 · Inspection
Compliant
March 6, 2023 · Inspection
Non-compliant
Maintenance Requirements — Accommodation is maintained
Evidence required that the accommodation, equipment and furnishings are well maintained and in good
Issued March 6, 2023. Fix by June 6, 2023. Status: Rectified (May 31, 2023).
Water Temperature — Safe water temperatures
Evidence required that the hottest water temperature flowing out of the faucets in resident areas do
Issued March 6, 2023. Fix by March 21, 2023. Status: Rectified (April 11, 2023).
Cleaning Requirements — Clean and comfortable environment
Evidence required of a clean and comfortable environment.
Issued March 6, 2023. Fix by March 21, 2023. Status: Rectified (April 11, 2023).
Continuation of Services — Practicability, communication and review of plans
Evidence required that the continuation of services plan is communicated and made available to resid
Issued March 6, 2023. Fix by March 21, 2023. Status: Rectified (April 11, 2023).
March 31, 2021 · CMOH Inspection
Compliant
April 8, 2020 · Consultation
Not assessed (consultation)
January 8, 2020 · Inspection
Compliant
January 8, 2020 · Inspection
Compliant
January 17, 2019 · Inspection
Compliant
January 17, 2019 · Inspection
Compliant
January 9, 2018 · Inspection
Non-compliant
Continuation of Services — Practicability, communication and review of plans
Evidence required that the continuation of services plan is communicated and made available to resid
Issued January 9, 2018. Fix by February 28, 2018. Status: Rectified (February 9, 2018).
Prevention of Abuse — Education on prevention, identification and reporting abuse
Evidence required that demonstrates that all employees have received appropriate education respectin
Issued January 9, 2018. Fix by February 28, 2018. Status: Rectified (February 9, 2018).
Resident Safety and Security — Monitoring and accounting for residents
Evidence required that residents are accounted for on a daily basis.
Issued January 9, 2018. Fix by February 28, 2018. Status: Rectified (February 9, 2018).
January 12, 2017 · Inspection
Compliant
January 13, 2016 · Inspection
Compliant
January 12, 2015 · Inspection
Compliant
January 22, 2014 · Inspection
Non-compliant
Water Temperature — Training, maintenance and risk mitigation to ensure safe water temperatures
Evidence required that regularly scheduled checks are in place to ensure that safe water temperature
Issued January 22, 2014. Fix by February 28, 2014. Status: Rectified (January 23, 2014).
October 18, 2013 · Inspection
Non-compliant
Cleaning Requirements — Regularly scheduled cleaning of all areas
Evidence required that the accommodation is cleaned on a regularly scheduled basis.
Issued January 14, 2013. Fix by January 31, 2014. Status: Rectified (January 23, 2014).
Maintenance Requirements — Preventative and corrective maintenance
Evidence required of a scheduled preventative maintenance and repair program.
Issued January 14, 2013. Fix by January 31, 2014. Status: Rectified (January 23, 2014).
Continuation of Services — Contingency plans
Evidence required that the continuation of services plan includes provisions for loss of utilities,
Issued January 14, 2013. Fix by January 31, 2014. Status: Rectified (November 7, 2013).
June 17, 2013 · Inspection
Non-compliant
Maintenance Requirements — Preventative and corrective maintenance
Evidence required of a scheduled preventative maintenance and repair program.
Issued January 14, 2013. Fix by October 31, 2013. Status: Rectified (January 23, 2014).
Bedding — Quality and regularly scheduled bedding and towel changes
Evidence required that bedding is in good condition and changed on a regularly scheduled basis.
Issued January 14, 2013. Fix by October 31, 2013. Status: Rectified (October 22, 2013).
Continuation of Services — Contingency plans
Evidence required that the continuation of services plan includes provisions for loss of utilities,
Issued January 14, 2013. Fix by October 31, 2013. Status: Rectified (November 7, 2013).
Cleaning Requirements — Regularly scheduled cleaning of all areas
Evidence required that the accommodation is cleaned on a regularly scheduled basis.
Issued January 14, 2013. Fix by October 31, 2013. Status: Rectified (January 23, 2014).
Questions to ask on a visit
Built from the standards this home was cited under, not from anything we found. Ask how it meets each one today.
- How does the home meet: Social or Leisure Activities — Resident needs, feedback and opinions considered?
- How does the home meet: Water Temperature — Safe water temperatures?
- How does the home meet: Maintenance Requirements — Preventative and corrective maintenance?
- How does the home meet: Cleaning Requirements — Regularly scheduled cleaning of all areas?
- How does the home meet: Continuation of Services — Practicability, communication and review of plans?
- How does the home meet: Concerns and Complaints — Written processes for managing concerns and complaints?
Homes nearby
Straight-line distance between postal code centres (in rural Alberta, town centres). Each home’s share of non-compliant visits since 2023, on the same method as the city pages.
| Home | Type | Distance | Non-compliant |
|---|---|---|---|
| The Mustard SeedBeltline, Calgary · 224 units | Assisted living | under 1 km | 33%1 of 3 visits |
| Ursa - Alice BissettDowntown Commercial Core, Calgary · 5 units | Group home | under 1 km | 0%0 of 2 visits |
| Carewest Rouleau ManorMission, Calgary · 77 units | Long-term care (Type A) | 1.0 km | 67%2 of 3 visits |
| Clover LivingChinatown, Calgary · 174 units | Assisted living | 1.0 km | 33%1 of 3 visits |
| Aspira BritanniaCliff Bungalow, Calgary · 70 units | Assisted living | 1.1 km | 67%2 of 3 visits |
| Eau Claire Retirement ResidenceDowntown Commercial Core, Calgary · 73 units | Type B (designated supportive living) | 1.4 km | 75%3 of 4 visits |
Check the government’s record
Inspections are a snapshot. Visit, ask for the home’s latest inspection report, and ask the questions above. Concerns about a specific visit go to the home first, then to the Continuing Care Licensing Office (cclo@gov.ab.ca).
Source: Government of Alberta, Continuing Care Accommodation Standards compliance reporting on Open Alberta (Open Government Licence – Alberta), file of —, with visits to July 6, 2026. Results are as the government recorded them. An inspection is a snapshot. The official record and the finding text are on the government’s viewer; the dates and statuses here come from the file. How this is built.