Assisted living
Manor Village at Signature Park (the)
Signal Hill, Calgary, Alberta. Operated by Manor Village Life Centers INC..
- Visits since 2023
- 4
- 1 of 4 visits
- Non-compliant visits since 2023
- 1
- 25% of visits
- Open non-compliances
- 0
- issued, in progress or ongoing
- Last assessed visit
- May 2026
- Compliant
Visits from January 1, 2023 to July 6, 2026, the comparison window. Only visits that assessed compliance are counted; consultations are not. Open means issued, in progress or ongoing when the file was taken; the other counts cover every year.
About this home
Every visit on record
Newest first. A visit that found nothing says so. Each finding shows the standard it was cited under, when it was issued, the date by which it had to be fixed, and where it stands.
May 8, 2026 · Complaint Investigation
Compliant
December 1, 2025 · Inspection
Non-compliant
Maintenance Requirements — Preventative and corrective maintenance
Evidence required of a scheduled preventative maintenance and repair program.
Issued December 1, 2025. Fix by February 1, 2026. Status: Rectified (December 1, 2025).
June 24, 2024 · Inspection
Compliant
December 7, 2023 · Inspection
Compliant
November 5, 2021 · CMOH Inspection
Compliant
November 5, 2021 · Inspection
Compliant
November 4, 2021 · CMOH Inspection
Non-compliant
COVID-19 Chief Medical Officer of Health Orders Expectations Not Met — Entry Screening Process
Issued November 4, 2021. Fix by November 5, 2021. Status: Rectified (November 5, 2021).
November 4, 2021 · Inspection
Non-compliant
Water Temperature — Safe water temperatures
Evidence required that the hottest water temperature flowing out of the faucets in resident areas do
Issued November 4, 2021. Fix by November 5, 2021. Status: Rectified (November 5, 2021).
April 30, 2020 · Consultation
Not assessed (consultation)
June 13, 2019 · Inspection
Compliant
June 13, 2019 · Inspection
Compliant
June 6, 2018 · Inspection
Compliant
June 6, 2018 · Inspection
Compliant
June 8, 2017 · Inspection
Compliant
June 15, 2016 · Inspection
Compliant
June 4, 2015 · Inspection
Compliant
June 13, 2014 · Inspection
Compliant
June 17, 2013 · Inspection
Compliant
Questions to ask on a visit
Built from the standards this home was cited under, not from anything we found. Ask how it meets each one today.
- How does the home meet: Maintenance Requirements — Preventative and corrective maintenance?
- How does the home meet: COVID-19 Chief Medical Officer of Health Orders Expectations Not Met — Entry Screening Process?
- How does the home meet: Water Temperature — Safe water temperatures?
Homes nearby
Straight-line distance between postal code centres (in rural Alberta, town centres). Each home’s share of non-compliant visits since 2023, on the same method as the city pages.
| Home | Type | Distance | Non-compliant |
|---|---|---|---|
| Wentworth Manor (the Residence)Christie Park, Calgary · 37 units | Type B (designated supportive living) | under 1 km | 67%4 of 6 visits |
| Wentworth Manor - the CourtChristie Park, Calgary · 79 units | Long-term care (Type A) | under 1 km | 50%3 of 6 visits |
| Carewest Signal PointeSignal Hill, Calgary · 54 units | Long-term care (Type A) | under 1 km | 75%3 of 4 visits |
| Verve Aspen WoodsAspen Woods, Calgary · 175 units | Assisted living | 1.6 km | 50%2 of 4 visits |
| Shalem HavenGlamorgan, Calgary · 43 units | Assisted living | 2.4 km | 75%3 of 4 visits |
| Aspen Heights Retirement ResidenceCalgary, · 68 units | Type B (designated supportive living) | 2.6 km | 67%2 of 3 visits |
Check the government’s record
Inspections are a snapshot. Visit, ask for the home’s latest inspection report, and ask the questions above. Concerns about a specific visit go to the home first, then to the Continuing Care Licensing Office (cclo@gov.ab.ca).
Source: Government of Alberta, Continuing Care Accommodation Standards compliance reporting on Open Alberta (Open Government Licence – Alberta), file of —, with visits to July 6, 2026. Results are as the government recorded them. An inspection is a snapshot. The official record and the finding text are on the government’s viewer; the dates and statuses here come from the file. How this is built.