Long-term care (Type A)
Vegreville Care Centre
Vegreville, Alberta. Operated by Assisted Living Alberta.
- Visits since 2023
- 4
- 3 of 4 visits
- Non-compliant visits since 2023
- 3
- 75% of visits
- Open non-compliances
- 0
- issued, in progress or ongoing
- Last assessed visit
- Dec 2025
- Compliant
Visits from January 1, 2023 to July 6, 2026, the comparison window. Only visits that assessed compliance are counted; consultations are not. Open means issued, in progress or ongoing when the file was taken; the other counts cover every year.
About this home
- Type
- Continuing Care Home Type A
- Subtype
- —
- Units
- 59
- City
- Vegreville
- Address
- 4525 50 Street, Vegreville, Alberta, T9C0A1
- Record source
- ASTRAL (as the file gives it)
- First and last visit on record
- Jul 2019 to Dec 2025
Every visit on record
Newest first. A visit that found nothing says so. Each finding shows the standard it was cited under, when it was issued, the date by which it had to be fixed, and where it stands.
December 2, 2025 · Inspection
Compliant
January 21, 2025 · CCHSS Investigation
Non-compliant
Quality Improvement Reporting — Policies and procedures for tracking incidents and near-misses are documented and implemented.
Issued January 21, 2025. Fix by April 30, 2025. Status: Rectified (January 27, 2025).
January 21, 2025 · CCHSS Inspection
Non-compliant
Oral Care Assistance and Bathing Frequency in Continuing Care Homes — Documented bathing preference in Care Plan.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Quality Improvement Reporting — Quality improvement policies and programs are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Restraint Management and Secure Spaces — Documentation for restraint use.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Medication Management — Policies and procedures in Medication Management are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Safe Bath and Shower Water Temperature — Policies and procedures for water supply system and temperature checks
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Quality Improvement Reporting — Policies and procedures for tracking incidents and near-misses are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 27, 2025).
Standardized Assessment and Person-Centred Care Planning — Client's Care Plan is reviewed.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Infection Prevention and Control — Infection Prevention and Control (IPC) policies and procedures are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Standardized Assessment and Person-Centred Care Planning — The care plan reflects the findings of the assessment and is kept up to date.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Staff Training — Policies and procedures for Staff training are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Quality Improvement Reporting — Policies and procedures for tracking incidents and near-misses are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Risk Management — Managed risk agreements are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
Safe Bath and Shower Water Temperature — Policies and procedures regarding safe water temperatures are documented and implemented.
Issued January 21, 2025. Fix by April 27, 2025. Status: Rectified (January 21, 2025).
October 30, 2024 · Complaint Investigation
Non-compliant
Maintenance Requirements — Accommodation is maintained
Evidence required that the accommodation, equipment and furnishings are well maintained and in good
Issued October 30, 2024. Fix by November 30, 2024. Status: Rectified (October 30, 2024).
April 21, 2022 · Quality Monitoring Visit
Compliant
December 3, 2020 · Quality Monitoring Visit
Compliant
July 31, 2019 · CCHSS Audit
Non-compliant
CCHSS standard 4.4
Personal Directives, Power of Attorney, guardian/trusteeship or Advance Care Planning information.
Issued July 31, 2019. Status: Resolved (August 26, 2019).
CCHSS standard 10.1
Managed risk agreements are documented and implemented.
Issued July 31, 2019. Status: Resolved (August 26, 2019).
CCHSS standard 11.1
Infection Prevention and Control (IPC) policies and procedures are documented and implemented.
Issued July 31, 2019. Status: Resolved (August 26, 2019).
Questions to ask on a visit
Built from the standards this home was cited under, not from anything we found. Ask how it meets each one today.
- How does the home meet: Quality Improvement Reporting — Policies and procedures for tracking incidents and near-misses are documented and implemented.?
- How does the home meet: Oral Care Assistance and Bathing Frequency in Continuing Care Homes — Documented bathing preference in Care Plan.?
- How does the home meet: Quality Improvement Reporting — Quality improvement policies and programs are documented and implemented.?
- How does the home meet: Restraint Management and Secure Spaces — Documentation for restraint use.?
- How does the home meet: Medication Management — Policies and procedures in Medication Management are documented and implemented.?
- How does the home meet: Safe Bath and Shower Water Temperature — Policies and procedures for water supply system and temperature checks?
Homes nearby
Straight-line distance between postal code centres (in rural Alberta, town centres). Each home’s share of non-compliant visits since 2023, on the same method as the city pages.
| Home | Type | Distance | Non-compliant |
|---|---|---|---|
| Century Park LodgeVegreville · 40 units | Type B (designated supportive living) | under 1 km | 89%8 of 9 visits |
| Homestead Senior Citizen's LodgeVegreville · 70 units | Lodge | under 1 km | 50%1 of 2 visits |
| Heritage HouseVegreville · 14 units | Assisted living | under 1 km | 40%2 of 5 visits |
| 51st Street ResidenceVegreville · 4 units | Group home | 1.2 km | 0%0 of 2 visits |
| Vegreville ManorVegreville · 15 units | Type B (designated supportive living) | 1.4 km | 50%1 of 2 visits |
| Mary Immaculate Care CentreMundare · 30 units | Long-term care (Type A) | 22 km | 100%4 of 4 visits |
Check the government’s record
Inspections are a snapshot. Visit, ask for the home’s latest inspection report, and ask the questions above. Concerns about a specific visit go to the home first, then to the Continuing Care Licensing Office (cclo@gov.ab.ca).
Source: Government of Alberta, Continuing Care Accommodation Standards compliance reporting on Open Alberta (Open Government Licence – Alberta), file of —, with visits to July 6, 2026. Results are as the government recorded them. An inspection is a snapshot. The official record and the finding text are on the government’s viewer; the dates and statuses here come from the file. How this is built.